Glodacert

KOREA / KC & RRA MARKET ACCESS

Korea KC certification.Built around
your product.

From AI server configurations to testing coordination, we help manufacturers plan the evidence, partners and decisions behind Korean market access.

Illustration of Seoul skyline and N Seoul Tower
SEOUL · REPUBLIC OF KOREA
Scope firstStart with the product and its use
Configuration-ledPlan around the system being sold
Lifecycle supportThink beyond the first approval

01 / UNDERSTAND THE PROJECT

The difficult part starts
before the application.

A useful Korea certification plan connects regulatory scope, the actual product configuration and a workable testing arrangement. A certificate name alone does not answer those questions.

01 — PRODUCT DEFINITION

One model name.
Several configurations.

Optional cards, power supplies, cooling systems and rack integration can change the evidence that needs to be reviewed. Define the commercial configuration before selecting a test sample.

02 — TEST READINESS

The test itself is only
part of the project.

For large systems, shipment, installation, power, cooling and operating loads can shape cost and feasibility. These details belong in the testing plan from the beginning.

03 — PRODUCT LIFECYCLE

The next revision
is already a decision.

A product roadmap often includes new cards, models and system architectures. Keep a clear configuration baseline so later changes can be assessed against the original evidence.

02 / CERTIFICATION STRATEGY

Choose a route.
Understand the trade-offs.

We start by reviewing product function, intended use, interfaces and existing evidence. This page focuses on RRA and EMC project planning; other potentially relevant requirements are assessed separately.

PLANNING OPTIONWHEN TO EXPLORE ITWHAT TO CONFIRM FIRST
Testing at a Korean laboratoryA coordinated sample-to-lab project.When a representative configuration can be shipped, installed and operated at the selected facility.Sample scope, logistics, power and cooling, operating modes, support personnel and documentation.
Testing coordination in TaiwanFeasibility review before committing.When large equipment or complex installation makes overseas shipment difficult.The applicable assessment route, laboratory agreement, facility suitability and any witness or acceptance conditions.
Reviewing existing evidenceA gap assessment before new testing.When reports or previous approvals may be relevant to the planned Korean configuration.Issuing laboratory, report scope and version, product differences and applicability to the intended route.
Our approach: compare the evidence required and the practical execution burden together. Existing CE/FCC reports or a previous KC project should be reviewed as inputs, rather than treated as automatic acceptance.

03 / TECHNICAL FOCUS

Look at the system.
Then look at the differences.

For AI servers and other complex equipment, three conversations help turn an initial request into a testable project.

SYSTEM BOUNDARY

L10, L11 and the
configuration being sold

Which assemblies, interfaces and optional components belong in the assessment? Align the product description with the intended sales configuration.

  • Server, rack and external connections
  • Cards, storage and peripheral options
  • Representative configuration and loading
EMC ENVIRONMENT

Air cooling to
liquid cooling

The same card can operate in a different electrical and mechanical environment. Compare the complete systems before extending assumptions from one to another.

  • Chassis, grounding and bonding
  • Power supply and load conditions
  • Pumps, CDU controls and cable routing
TEST PREPARATION

A system that can
run the right test

Resolve the operating setup before equipment arrives. The test team needs a repeatable configuration, usable instructions and the right technical support.

  • Operating software and exercise modes
  • Utilities, fixtures and cooling needs
  • Configuration records and photographs

04 / LOCAL EXECUTION

Clear responsibilities.
Fewer unresolved hand-offs.

Define the decisions, owners and evidence at each stage. The detailed sequence depends on the product and the assessment route agreed for the project.

01 / DEFINE

Scope & configuration

Review product information, intended configurations and existing reports. Identify open questions before booking tests.

02 / PREPARE

Test readiness

Coordinate the laboratory, sample, operating setup, logistics and supporting documents.

03 / COORDINATE

Testing & application

Track technical questions and document requests. Keep product information consistent across the project.

04 / MAINTAIN

Baseline & changes

Retain the assessed configuration and evidence so the next revision can be reviewed with context.

MANUFACTURER / BRANDGLODACERTLABORATORY / RELEVANT BODY
Owns product design, configuration accuracy, technical information and production consistency.Coordinates requirements review, testing preparation, documentation and project communication.Performs testing and the applicable assessment or review within its authorized scope.

05 / A REAL PROJECT QUESTION

Same FPGA card.
Different certification question.

A case from our published project experience shows why configuration review matters more than checking whether a part number stayed the same.

CASE STUDY / AI SERVER

From an air-cooled
L10 system to a
liquid-cooled server.

The FPGA card had already been used in an assessed server configuration. The client wanted to use the same model in another system.

Read the full case study ↗
THE CLIENT’S QUESTION

“The card model, PCB and function have not changed. Can the previous KC RRA evidence carry over?”

THE ASSESSMENT QUESTION

Has the overall EMC configuration changed? Compare chassis, cooling equipment, power loading, cable routing and grounding.

THE PRACTICAL TAKEAWAY

Document the differences first. The assessment should determine how the original evidence can be used and what further review or testing may be needed.

06 / AFTER THE FIRST APPROVAL

Plan the next change
against a clear baseline.

A hardware change does not answer its own certification question. Start with the difference between the assessed product and the proposed configuration.

PROPOSED CHANGEWHY IT DESERVES A REVIEWUSEFUL INPUTS
FPGA, NIC, SSD or other optionInterfaces, installation, emissions and system loading may differ.Old/new specifications, slot location and operating configuration.
Power supply or cooling architecturePower conditions, noise sources, grounding or cabling may change.Power and cooling diagrams, chassis details and photographs.
New model or product familyCommercial naming and actual technical differences need to be mapped together.Model comparison matrix and an explanation of shared and different features.
Functions, firmware or RF featuresThe relevant review depends on what changes in operation or technical characteristics.Change description, affected functions and previous reports.
A useful handover file includes the assessed configuration, reports, model list and change history. It makes the next review more specific than starting again with only a certificate number.

KC × AI SERVER / SIX-PART ARTICLE SERIES

Practical knowledge.
One topic at a time.

A dedicated six-part series for AI server ODM/OEM teams and international brands, covering overseas witness testing and the decisions behind Korea KC EMC projects.

ARTICLE 1 / 6 · OVERSEAS WITNESS TESTING

Can AI servers be tested outside Korea for KC EMC?

Understand witness testing, laboratory and report acceptance, and the three points to confirm before scheduling.

Read the English article ↗

Available in English, 繁體中文 and 简体中文.

COMING NEXT IN THE SERIES

From preparation to registration.

  1. 2 / 6 — Witness test preparation checklist
  2. 3 / 6 — Rack-level vs. standalone testing
  3. 4 / 6 — Power ratings and operating conditions
  4. 5 / 6 — Model families and configuration changes
  5. 6 / 6 — From test planning to KC registration

07 / KNOWLEDGE & PRACTICAL QUESTIONS

Go deeper into the decisions.

Explore our project experience alongside the official RRA framework. Project examples explain our approach; they do not replace the requirements applicable to a specific product.

PROJECT EXPERIENCE

Server hardware changes & KC RRA

Why the same FPGA card in a different system can raise a new assessment question.

Read the case study ↗
LABORATORY EXCHANGE

Glodacert × KTL: AI server testing

Our exchange on Korea RRA certification, large equipment and testing coordination in Taiwan.

Explore the discussion ↗
OFFICIAL REFERENCE

RRA conformity assessment framework

RRA describes conformity certification, compatibility registration and interim conformity assessment. Product scope determines the relevant route.

Visit the RRA website ↗

Questions worth asking before a quotation

Can we use our existing CE/FCC reports?

Share them during the initial review. We need to compare their scope, issuing laboratory and tested configuration with the intended Korean project before deciding what evidence can be used.

Can a large AI server be tested in Taiwan?

We can explore feasibility with the relevant laboratory. Any proposed arrangement needs confirmation of the assessment route, facility, scope and applicable witness or report-acceptance conditions before a testing commitment.

Does every component change require a complete retest?

The starting point is a change assessment. Identify the technical differences and their impact before deciding whether existing evidence is sufficient or additional review or testing is needed.

Why not quote a fixed lead time immediately?

A useful schedule needs an agreed product scope, test configuration, laboratory availability and document readiness. We establish those inputs before building a project-specific timeline.

08 / START WITH YOUR PRODUCT

Let’s work through
your Korea project.

Send the product background and the decision you need to make. We can use those inputs to scope the next review, rather than begin with a generic certification checklist.

Discuss your Korea project ↗

Inquiry@glodacert.co · +886-2-8601 2828

Helpful information for the first discussion

  1. Product description, intended use and model list
  2. System configuration, interfaces and RF functions
  3. Power, cooling and installation requirements
  4. Existing reports, approvals and proposed changes
  5. Target launch date and known project constraints